Acta academica karviniensia 2019, 19(4):42-50 | DOI: 10.25142/aak.2019.024
PRODUCTION LEAD TIME AS A TOOL TO MEASURE LEANNESS LEVEL
- Faculty of Business and Management, Brno University of Technology, Kolejní 2906/4, 612 00 Brno
Measurement of lean production is a topic which isn’t too often mentioned by authors focused on lean methodology. We have decided to focus on this gap, because we believe that it is important part of successful implementation of lean production. We have created a simple method related to evaluation of leanness of production processes using production lead time. Based on our survey we could prove our method in real companies, using real data and parameters of their production lines. We asked responsible persons in addressed companies for an interview during which we filled in our questionnaire. Results brought us interesting insights into the current situation of production companies located mainly in the Czech Republic, but often with the international background. Based on it we understand that there is a lot of opportunities for improvements including higher adoption of lean production. Also, we have realized that our methodology related to measurement of leanness level of production is a tool, which can support it.
Keywords: lead time, lean manufacturing, Little's Law, performance measurement, production management.
JEL classification: M11
Received: March 26, 2020; Revised: April 28, 2020; Accepted: September 9, 2020; Published: September 10, 2020 Show citation
References
- AGUS, A. and M. S. HAJINOOR, 2012. Lean production supply chain management as driver towards enhancing product quality and business performance. International Journal of Quality & Reliability Management, 29(1): 92-121. ISSN: 0265-671X.
Go to original source...
- ANVARI, A., N. ZULKIFLI and R. M. YUSUFF, 2013. A dynamic modelling to measure lean performance within lean attributes. The International Journal of Advanced Manufacturing Technology, 66(5-8): 663-677. ISSN: 0268-3768.
Go to original source...
- BAYOU, M. E. and A. DE KORVIN, 2008. Measuring the leanness of manufacturing systems: a case study of Ford Motor Company and General Motors. Journal of Engineering & Technology Management, 25(4): 287-304. ISSN: 0923-4748.
Go to original source...
- BEHROUZI, F. and K. Y. WONG, 2011. Lean performance evaluation of manufacturing systems: a dynamic and innovative approach. Procedia Computer Science, 3: 388-95. ISSN: 1877-0509.
Go to original source...
- COMM, A. R. and D. F. X. MATHAISEL, 2000. A paradigm for benchmarking Lean initiatives for quality improvement. Benchmarking: An International Journal, 7(2): 118-127. ISSN: 1463-5771.
Go to original source...
- DETTY, R. B. and J. C. YINGLING, 2000. Quantifying benefits of conversion to lean manufacturing with discrete event simulation: a case study. International Journal of Production Research, 28(2): 429-445. ISSN: 0020-7543.
Go to original source...
- EROGLU, C. and C. HOFER, 2011. Lean, leaner, too lean? The inventory-performance link revisited. Journal of Operations Management, 29(4): 356-369. ISSN: 0272-6963.
Go to original source...
- FOGARTY, D. W., 1992. Work in process: performance measures. International Journal of Production Economics, 26(1): 169-172. ISSN: 0925-5273.
Go to original source...
- FULLERTON, R. R. and W. F. WEMPE, 2009. Lean manufacturing, non-financial performance measures, and financial performance. International Journal of Operations & Production Management, 29(3): 214-40. ISSN: 0144-3577.
Go to original source...
- HOFER, C., C. EROGLU and A. ROSSITER HOFER, 2012. The effect of lean production on financial performance: The mediating role of inventory leanness. International Journal of Production Economics, 138(2): 242-253. ISSN: 0925-5273.
Go to original source...
- KARLSSON, C. and P. AHLSTROM, 1996. Assessing changes towards lean production management. International Journal of Operations and Production Management, 16(2): 24-41. ISSN: 0144-3577.
Go to original source...
- KARIM, A. and K. ARIF-UZ-ZAMAN, 2013. A methodology for effective implementation of lean strategies and its performance evaluation in manufacturing organizations. Business Process Management Journal, 19(1): 169-196. ISSN: 1463-7154.
Go to original source...
- LIKER, J., 2004. The Toyota Way: 14 Management Principles from the World's Greatest Manufacturer. McGraw-Hill, NY, ISBN: 8601300053356.
- LITTLE, J. D. C., 1961. A proof for the queuing formula: L=own. Operations Research, 9(3): 383-387. ISSN 0030-364X.
Go to original source...
- MCIVOR, R., 2001. Lean supply: the design and cost reduction dimensions. European Journal of Purchasing and Supply Management, 7(4): 227-242. ISSN: 1478-4092.
Go to original source...
- MEDONOS, M. and M. JUROVÁ, 2017. Measuring the level of leanness of production-use of production lead time. Scientific papers of the University of Pardubice. Series D, Faculty of Economics and Administration. 40/2017: 143-153. ISSN: 1211-555X.
- NADERI, B., M. ZANDIEH and S. M. T. FATEMI GHOMI, 2009. Scheduling job shop problems with sequence-dependent setup times. International journal of production research, 47(21): 5959-5976. ISSN: 0020-7543.
Go to original source...
- NAYLOR, J. B., M. M. NAIM and D. BERRY, 1999. Leagility: integrating the lean and agile manufacturing paradigms in the total supply chain. International Journal of Production Economics, 62(1): 107-118. ISSN: 0925-5273.
Go to original source...
- SANCHEZ, A. M. and M. P. PEREZ, 2001. Lean indicators and manufacturing strategies. International Journal of Operations & Production Management, 21(11): 1433-1452. ISSN: 0144-3577.
Go to original source...
- SHAH, R. and P. T. WARD, 2007. Defining and developing measures of lean production. Journal of Operations Management, 2007, 25(4): 785-805. ISSN: 0272-6963.
Go to original source...
- SORIANO-MEIER, H. and P. L. FORRESTER, 2002. A model for evaluating the degree of leanness of manufacturing firms. International Journal of Integrated Manufacturing Systems, 13: 104-9. ISSN: 0957-6061.
Go to original source...
- SRINIVASARAGHAVAN, J. and V. ALLADA, 2006. Application of mahalanobis distance as a lean assessment metric. The International Journal of Advanced Manufacturing Technology, 29(11-12): 1159-1168. ISSN: 0268-3768.
Go to original source...
- SWAMIDASS, P. M., 2007. The effect of TPS on US manufacturing during 1981-1998: inventory increased or decreased as a function of plant performance. International Journal of Production Research, 2007, 45(16): 3763-78. ISSN: 0020-754.
Go to original source...
- VINODH, S. and S. R. BALAJI, 2011. Fuzzy logic based leanness assessment and its decision support system. International Journal of Production Research, 49(13): 4027-4041. ISSN: 0020-754.
Go to original source...
- WAN, H. D., F. FRANK CHEN and L. RIVERA, 2007. Leanness score of value stream maps. Proceedings of the 2007 Industrial Engineering Research Conference, ISBN: 1-4244-1529-2
- WAN, H. D. and F. FRANK CHEN, 2008. A leanness measure of manufacturing systems for quantifying impacts of lean initiatives. International Journal of Production Research, 46(23): 6567-6584. ISSN: 0020-754.
Go to original source...
- WOMACK, J., D. JONES and D. ROOS, 1990. The Machine That Changed The World. Rawson Associates, NY, ISBN: 0060974176.
- WONG, W. P., J. IGNATIUS and K. L. SOH, 2014. What is the leanness level of your organization in lean transformation implementation? An integrated lean index using ANP approach. Production Planning and Control, 25(4): 273-287. ISSN: 0953-7287.
Go to original source...
- WU, S. and H. M. WEE, 2009. Lean supply chain and its effect on product cost and quality: a case study on Ford Motor Company. Supply Chain Management: An International Journal, 14(5), pp. 335-341. ISSN: 1359-8546.
Go to original source...